Long Beach light rail system

LA Metro Board Approves Environmental Drafts for Westside Subway Extension and Regional Connector Projects

metro subway extension projects - blueline The Regional Connector Project recommendations include a fully-underground light rail line connecting the Metro Gold Line, Metro Blue Line and the future Expo Line. The Los Angeles County Metropolitan Transportation Authority (Metro) Board of Directors approved the Draft Environmental Impact Statement/Report (EIS/R) for the Westside Subway Extension and Regional Connector projects, clearing the way for both projects to enter final environmental review and preliminary engineering.

Metrolink’s state-of-the-art rail cars arrive at Port of Long Beach

#gallery-1 { margin: auto; } #gallery-1 .gallery-item { float: left; margin-top: 10px; text-align: center; width: 33%; } #gallery-1 img { border: 2px solid #cfcfcf; } #gallery-1 .gallery-caption { margin-left: 0; } /* see gallery_shortcode() in wp-includes/media.php */ Metrolink will be the first passenger rail system in the nation to adopt these state-of-the-art cab and passenger cars, which feature unique crash energy management (collision-absorption) technology.

  • get long beach news by email